Condition Reports · Malta

Condition reports before works start next door

A pre-construction condition report is the photographic, signed record of your property's state before neighbouring excavation or demolition begins — prepared by a warranted Perit. If damage ever appears, this report is what proves it.

Perit Christopher Tabone · Warrant No. 1271 24+ years in Maltese property Sliema · all of Malta & Gozo
Pre-construction condition report in Malta — documenting a property before neighbouring works

What you get

How it works

Step 1

Tell us what's happening

Works starting next door — tell us the property and, if you know it, when works begin.

Step 2

We inspect and document

A thorough photographic survey of the property, inside and out.

Step 3

Report in your hands

A signed condition report you can rely on if damage ever needs to be proven.

Request a condition report

Tell us the property and when the neighbouring works start — we reply with a fee and the earliest inspection date.

Request received

Thank you — your request is with us and lands directly in the studio. We reply within one working day, usually sooner, from [email protected].